

On the Critical Path
On the Critical Path
Release date : 1971-01-01
Production country :
Canada
Production company :
ONF | NFB
Durasi : 22 Min.
Popularity : 0
0.00
Total Vote : 0
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
Related Moviesâ¨
Movies

Nuclear Now
2022
7.00
Movies

Seabrook 1977
1978
1
Movies

The Atom: A Love Affair
2019
6.80
Movies

Uranium Drive-In
2013
1
Movies

Inside Chernobyl with Ben Fogle
2021
7.60
Movies

The Battle of Chernobyl
2007
7.50
Movies

We Are the Guinea Pigs
1980
6.00
Movies

Atomic: Living in Dread and Promise
2015
6.60
Movies

Voices from Chernobyl
2016
6.10
Movies

Thorium, the Far Side of Nuclear Power
2016
6.50
Movies

Letter from Tokyo
2018
1
Movies

Atom and its energy
1958
1
Movies

Sista varningen!
1980
1